| Your
Details |
Mandatory Fields* |
| Company Name:* |
|
| Contact Name:* |
Position:
|
| Address:* |
|
| |
|
| |
|
| Town/City:* |
|
| Postcode:* |
|
| Tel:* |
Ext:
|
| Fax: |
|
| Email:* |
|
| |
|
| Budget: |
Timescales:
|
| Mezzanine
Floor Details |
|
| Mezzanine
Length (m): |
|
| Mezzanine Width
(m): |
|
| Mezzanine Deck
Height (m): |
|
| Underside
Height (m): |
|
| Column Grid (m x m): |
|
| Most Economical: |
|
| Loading: |
Specified Loading:
|
| Use of Floor: |
|
| Type of Decking: |
Specify: |
| No. of
Staircases: |
|
| No. of Top
Landings: |
|
| No. of Middle
Landings: |
|
| No. of
Catladders: |
|
| Pallet Gate: |
Quantity:
|
| Handrail (m): |
|
| Fascia
& Kicker (m): |
|
| *Suitable Fork Lift Available: |
|
| |
*Minimum
specification:
Counterbalance forklift truck fitted with side shift and to have a
minimum capacity of 1500kgs able to lift to the FFL of the floor. |
| WT. of Pallet Truck for Deck (kg): |
|
| Fire Protection: |
Square
Metres |
| Fireproof Fascia: |
Linear
Metres |
| Column Cladding/Fascia: |
|
| Authority
Approval Required: |
|
| Is Site Clear: |
|
| Skip Available On Site for Our waste: |
|
| If No Shall We Provide a Cost to Supply a
Skip: |
|
| Power On Site: |
|
| Normal Working
Hours: |
If No Please State:
|
| Distance
Between Unloading Point And Working Area: |
|
| Special Notes: |
|
| |
|